
Details
Views:
76
Tags
Data Info
Author
PEZARQUITECTOS SLP, PABLO RUIZ DORRONSORO
City
Madrid
Country
Spain
Year
2023
Program
Primary School
Technical Info
Site area
13230 sqm
Gfa
0
sqm
Density
0 far
Population density
0
inh/ha
Home Units:
0
Jobs
0
Streetsroad:
0
%
Buildup:
0
%
NonBuild-up:
0 %
Residential
0 %
Business
0
%
Commercial
0
%
Civic
0
%
Description
- The schoolyard has a large central open space with various sports courts
- Though equipped with a large playground, the space lacked elements of seating, shade, and relevant play equipment. Some lanes were not secure and there was poor segregation of vehicular circulation and pedestrian areas
- The transformation of the schoolyard aims to improve the pedestrian experience of the many students who walk from their homes to school
- There are plans to make the schoolyard into a public space for the neighborhood. Local sports clubs would use the grounds during non-school hours.
- The central patio is conceptualized as a small city with zones of varying intensity and activity
- The design proposes a welcoming entrance with benches and plants. This would act as a Waiting area for the students and their families
- The perimeter of the schoolyard acts as a transitional space
- Elements like vegetation, art murals and street lighting would improve the security of the isolated areas by encouraging activity in those spaces
- The square space near the entrance has been designed with play equipment targeted towards the user group attending the school
- The irregular border has been adapted as a soft permeable border between the two areas
- The sports court and the school buildings
- There has been an attempt to humanize the surroundings and introduce a scale that is suitable for children in the design
- The varied space within the schoolyard caters to elements for the various developmental stages of the children.
Location
Sources
Explore more Masterplans
|